Project Details

Location: Lake Charles, LA

Project Description: Dredge 36,000 cubic yards of maintenance material from Citgo’s C & D Docks. The material was pumped 4,000 linear feet away with a vertical lift of 25 feet. The dredged material was disposed of in an upland disposal site where a weir box was utilized to maintain the effluent water from the pond ensuring no material was being discharge back into the water way. We worked with Citgo to allow them to stay fully operational with no down time on dredging operations. The dredge barge was able to maneuver in close quarters to the ships coming in and out of the docks.