Project Details

Location: US Gulf of Mexico

Client Request: Provide immediate solution to include equipment and personnel to remove the tons of overburden that are preventing the rig from pulling free its bow leg.

Our Solution: Within 24 hours Javeler was mobilized aboard the drilling rig. We provided a DP-150 submersible dredge package with required personnel for 24 hour per day operations. The material was removed, the leg was pulled and our client successfully moved it drilling operations to the new location.

Job Status: Successfully Completed