Project Details

Location: Port of Portland

Client Request: Remove bucket dredged material which has been loaded into 1,500 cubic yard capacity (7-cell) barges. The thick dredged material must be transported 600′ to the assigned disposal area.

Our Solution: Provide the Javeler DP-150 dredge package which can successfully offload this material through 660′ of discharge pipe at a rate of 280+ cubic yards per hour.

Job Status: Successfully Completed