Project Details
Location: Atchafalaya River
Client Request: To cap a pipeline with a trench remaining after installment. The cap to install was 2000’ long X 55’ wide and 3” deep.
Our Solution: We deployed a 10” dredge system from a Crain Barge and a pipeline 2000’ into the swamp.
Job Status: The material was pumped into place successful with a +6” grade.