Water Intake Structure: Excavation Support

Location: Mississippi River, New Orleans, LA

Client Request: Provide a turn-key solution for excavating 9,000 cubic yards of river sediment that has accumulated in and around the municipalties water intake structure. Minimimal turbidity is required to ensure minimal facility downtime as well as having the ability excavate in confined spaces.

Our Solution: The “Miss Beulah” crane barge as well as a smaller flexi-float barge served as the work platforms. We utilized our DP-150 dredge system to accomplish the majority of the excavation before swithing to the DP-75 for the confined areas.

Job Status: Successfully Completed

Project Photos
  • JPWD02251217

    JPWD02251217

  • JPWD02251202

    JPWD02251202

  • JPWD02251222

    JPWD02251222

  • JPWD02251242

    JPWD02251242

  • JPWD02251240

    JPWD02251240