Internal Caisson Excavation: Platform Abandonment

Location: Mobile Bay, Alabama

Client Request: Excavate inside and clean interior walls of 36″ cassions in order to sever all jacket legs at 15′ BML for jacket removal. All materials inside of the pile must be captured to achieve 100% containment of spoils and jet water to eliminate any risk of contamination to Mobile Bay.

Our Solution: Provide JTO-8180 Internal Pile Excavator system and personnel along with frac tanks that were used to capture 100% of all spoils. Javeler was able to successfully excavate and clean the interior pile walls while safely removing all pumped material into tanks which would later be tested and properly disposed.

Job Status: Successfully Completed

Project Photos
  • mobiloebay1

    Javeler 8180 Mobile Bay

  • mobilebay8

    Javeler 8180 Mobile Bay

  • pilecleanermobilebay2

    Javeler 8180 Mobile Bay

  • pilecleanermobilebay3

    Javeler 8180 Mobile Bay

  • pilecleanermobilebay1

    Javeler 8180 Mobile Bay

  • mobilebay10

    Javeler 8180 Mobile Bay

  • mobilebay2

    Javeler 8180 Mobile Bay