Deep Water Dredging
Clients Problem:
Remove mud inside 7' diameter piles
at 4700" depth.
Solution: Javeler designed
S.O.P.H.E.
(SOil Plug Hydraulic Excavator)
Within 6 weeks Javeler designed, fabricated,
tested, mobilized, and completed excavation
of the piles.
For More info
Click Here |
|
 |
|
DP-50BA Deep Water Pump
Clients Problem:
Excavation of material on a pipe bury
project
in 200" of water.
Solution:
Javeler designed a pressure
compensated,
deep water dredge
pump system.
|
 |
 |
|
Dredging in Tight Spaces
Clients Problem:
Excavate material inside Coffer Dam with difficult
access.Solution:
Javeler designed a unique discharge pipe configuration
that provided a narrow footprint and included protection
for electric cable and jet hose.
For More Info
Click Here |
 |
 |
|
Texas A&M
Clients Problem:
Dock front dredging to generate
adequate floatation.Solution:
Javeler designed and built a disposal
area.
For More Info please
call:
337-364-5841 |
 |
 |
Meredith Cross Oubre
Copyright © 2007 [Javeler Construction Co., Inc]. All rights reserved.
Information in this document is subject to change without notice.
Other products and companies referred to herein are trademarks or registered trademarks of
their respective companies or mark holders. |
|